Customization: | Available |
---|---|
Certification: | CE, ISO |
Condition: | New |
Still deciding? Get samples of US$ 100/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1). CNC system controls 4 axis servo motor movements.
2). Polygon shape available.Automatically collect the wheel dust and check wheel wearing.
Brand Name | MAG |
Model | CMJ |
Power Supply | 380V 50Hz or customers specifications |
Total Power | 17kW |
Glass size | Max 2450mm×3000mm Min 300mm×600mm |
Glass thickness | 3~19mm |
Removing width | 0~150mm |
Removing speed | 0~30m/min(adjustable) |
Accuracy | ±0.2mm |
Air source | 0.6~0.8Mpa |
Wheel turning speed | 0~2700rpm(drove by inverter) |
Conveying belt height | 450±50mm |
Overall Dimension | 8200mm(L)×1800mm(W)×3500mm(H) |
Weight | 2100KG |
1. Are you a manufacturer?
Yes,we have been in providing the professional products in this field more than 20 years.
2. how to install the machine ?
we can intrust the install the machine by vedio, email ,picture.....if large project ,
we can arrange the worker help you to install it in your country .
3. How you pack the products ?
Normally as the export standard packaging or as you required.
4. What is your available port of shipment?
Qingdao port,shanghai,tianjin,guangzhou etc.
5. Is customized available ?
Yes, according to your detailed drawings you provide
6. After Sale Service
24 hours technical support by phone, email or skype (email or skype) .
12 months warranty period.
Our senior engineer is available to travel aboard, help the installation, maintenance and training staff.
By offering this support, we make sure the customer start the business smoothly,
to realize win-win cooperation
7. Are you trading company or manufacturer ?
We are factory and welcome to visit us at any time.
8. How long is your delivery time?
Generally single tanks need 7-15 days, for whole plant need 15-30days.
9.Do you have CE and ISO certification?
Yes.
10.What is your terms of payment ?
Free contact for the most suitable machine
Free professional design for each customer especially.
♦ L/C, 30% deposit by T/T,70% spare payment L/C.
♦ T/T, 30% deposit by T/T,70% spare payment before shipment.
♦ Western Union or Paypal.