Customization: | Available |
---|---|
Certification: | CE, FDA, ISO |
Glass conveyor speed: | 0-5m/min |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1).Vertical glass washing and drying machine is cleaning for flat glass with 3 pairs of brushes and air knife to drying.
2).Automatic clean and dry flat glass with the thickness of 3-19mm.
Brand name | MAG |
Model | BX2500V |
Power voltage | 380V 50Hz |
Max glass size | 2500*3000(mm) |
Min glass size | 500*300(mm) |
Transmission speed | 1-5m/min |
Thickness of washing glass | 3-19mm |
Power rate | 19Kw |
Overall dimmension | 7600*2000*3500(mm) |
Weight | 3500kg |
1. Are you a manufacturer?
Yes,we have been in providing the professional products in this field more than 20 years.
2. how to install the machine ?
we can intrust the install the machine by vedio, email ,picture.....if large project ,
we can arrange the worker help you to install it in your country .
3. How you pack the products ?
Normally as the export standard packaging or as you required.
4. What is your available port of shipment?
Qingdao port,shanghai,tianjin,guangzhou etc.
5. Is customized available ?
Yes, according to your detailed drawings you provide
6. After Sale Service
24 hours technical support by phone, email or skype (email or skype) .
12 months warranty period.
Our senior engineer is available to travel aboard, help the installation, maintenance and training staff.
By offering this support, we make sure the customer start the business smoothly,
to realize win-win cooperation
7. Are you trading company or manufacturer ?
We are factory and welcome to visit us at any time.
8. How long is your delivery time?
Generally single tanks need 7-15 days, for whole plant need 15-30days.
9.Do you have CE and ISO certification?
Yes.
10.What is your terms of payment ?
Free contact for the most suitable machine
Free professional design for each customer especially.
♦ L/C, 30% deposit by T/T,70% spare payment L/C.
♦ T/T, 30% deposit by T/T,70% spare payment before shipment.
♦ Western Union or Paypal.