Customization: | Available |
---|---|
Certification: | CE, ISO |
Control System: | PLC |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
LB1800P Vertical Automatic Flat Press Insulating Glass Production Line
a. The whole line is composed of feeding part, glass washing and drying part, lamp inspection part, glass conveyor part, aluminum frame locating part, flat (roller) press part, tilting part.
b. Low-E Insulating Glass Production Line, soft low-e brush installed, it can process low-e glass.
c. It can make triple insulating glass, that is three layers insulating glass and shaped insulating glass.
d. Washing and drying part with full stainless steel.
e. Heating device, auto heat the water in cold weather.
f. Man-machine interface, easy to operate
Power supply |
380V/50Hz |
Input power |
23.21Kw |
Cleaning speed |
2-12m/min |
Max. working speed |
48m/min |
Cleaning max. glass size |
2500*1800mm |
Cleaning min. glass size |
450*280mm |
Max. insulating glass thickness |
50mm |
Cleaning glass thickness |
3-12mm |
Overall dimension |
16290*2500*2890mm |
weight |
5500Kg |
1-Glass Cutting Machine
2-Automatic Spacer Bending Machine
3-Molecular Sieve Filling Machine
4-Butyl Extruder Machine
5-Automatic Flat Press Insulating Glass Production Line
6-Sealant-spreading Machine
7-Gas Filling Machine
1. All the electrical elements,Circuit breaker protection and AC contactors are schneider or other world famous brand.
2. International CE standard high flexibility, high shielding cables.
3. Warranty time: 1 year
4. Quotation Valid: 90 days
5. Payment terms: 30%T/T as deposit, 70% balance made before shipment by T/T
6. Delivery time: 30 days upon receipt of 30% deposit by T/T
7. Packaging: Film packaging and fumigation-free wooden case(if delivery by full container load, then without wooden box,just use the tray)
8. After sales service:
1)24 hours service on Internet and Telephone, free instructions and problem solving
2) Free training to make sure a master of the operating of cnc router for the person who come to our factory
3)User-friendly English manual or operating video for machine using and maintaining
4) on-the-spot training, installation and repairing can be met if required.(If so, need the buyer afford the visa and air ticket and 60USD/DAY Salary.